Your direct line to us:
+49 2161 92683-0
HCC-Banner_en.png

Technical data of HCC

 


 

 

 


Mounting position HCC

 

HCC scrapers are  placed in the lower belt directly behind the discharge drum. The best mounting position is the position B (approximately 120-150 mm from A, where the conveyor belt leaves the contact with the drums), tighten and vibration-free belt guide provided.

HCC M1

Use our xeperience, especially when space is restricted and critical, sicky bulk material massive cleaning problems prepare, with varying materials, seasonal changes in material consistency, etc.

TOP

System sketch HCC

 

HCC S1

 

TOP

Installation dimensions HCC

 

HCC E1

 

Measure A (installation variant A) when the springs are not under tension and without dead load/spring preload; standard with pressure spring (L=130 m); Measure A* (installation variant B); execution with pressure spring (L=60 mm); Measure A** (installation variant C) without pressure spring.

TOP

Installation dimensions/weights overview

 

Belt width
(mm)
QuantityxWidth of belt cleaner lamellas (mm) Standard Support tube-length (mm) D Support tube-Ø
(mm)
Lw (mm) A (mm) / A* (mm) / A** (mm) B (mm) C (mm) Weight tot. without Autom.1 (kg)
400/500 2 x 200 1500 60,3 450 290/220/170 170 100 11
600/650 3 x 200 1600 60,3 450 290/220/170 170 100 12
800 4 x 200 2000 60,3 450 290/220/170 170 100 17
1000 5 x 200 2000 60,3 450 290/220/170 170 100 18
1200 6 x 200 2500 60,3 450 290/220/170 170 100 22
1400 7 x 200 2700 60,3 450 290/220/170 170 100 27
1600 8 x 200 3000 76,1 450 310/240/190 200 120 47
1800 9 x 200 3000 76,1 450 310/240/190 200 120 49
2000 10 x 200 3500 76,1 450 310/240/190 200 120 56

1 Weight/Automatic adjusting unit, complete with left- and right-sided mounting bracket: 12.5 kg (support tube-Ø =60.3 mm) / 16 kg (support tube-Ø =76.1 mm)

TOP